/ Projects

PV + BESS Kurojedy

In preparation

A hybrid solar and battery storage project in the Tachov area with a significant share of revenue from commercial flexibility and balancing services.

About the project

Combining a larger solar plant with battery storage lets the project earn both from selling the electricity generated and from participating in the flexibility market, through arbitrage as well as balancing services.

Our role

Full project management and engineering, construction of the PV plant and BESS, financial structuring of the project and coordination with the aggregator.

Benefit for the client

A PV plus BESS hybrid makes full use of the site's own generation, which is the most advantageous model on the market today. It combines maximum use of own generation with flexibility revenue and a faster return on the investment.

Project parameters

Location

Kurojedy, Bor u Tachova, Plzeň Region

Year of delivery

2026

PV

Installed capacity

5.4 MWp

BESS

Input power

4 MW

Output power

4 MW

Capacity

10 MWh