BESS BULY ARÉNA
Completed
Battery storage for a sports complex in Kravaře, delivered turnkey including design, civil works and grid connection.

About the project
REGRID delivered and installed a containerised battery energy storage system for BULY ARÉNA in Kravaře, in the Opava district. The project covered the complete design documentation, civil preparation, technology supply and commissioning into permanent operation in cooperation with the distribution system operator.
Our role
Turnkey main contractor: engineering, civil works, supply and installation of the BESS technology, inspections and commissioning, and coordination with the aggregator.
Benefit for the client
Surplus energy from the site's own solar plant is stored and used for the complex's own consumption, which lowers distribution charges, reduces peak demand and provides backup during a grid outage. All delivered turnkey with a guaranteed schedule and price.
Project parameters
Location
Kravaře, Moravian-Silesian Region
Year of delivery
2026
BESS
Input power
0.5 MW
Output power
0.5 MW
Capacity
1.044 MWh